El Saeed Cement CEM II 32.5 N, LH
Our interest in Assiut Cement Company - CEMEX is to reduce pollution and carbon emissions resulting from the manufacturing and use of cement. The company took the lead in developing its Assiut cement product to CEM II / B-P (32.5 N), aiming to use materials with pozzolanic properties with clinker, in line with Egyptian and international specifications. Pozzolana improves the properties of cement and concrete by reducing the reaction temperature and cracks, as it reduces the porosity of the concrete.
- It can be used in all types of constructions.
- It is suitable for concrete elements of large cross sections (mass concrete).
- Suitable to be used in the hot weather.
- It gives high final compressive strength (28 days).
- It gives more workability for the concrete.
- It reduces concretes cracks.
- Suitable to be used in hot weather.
Egyptian Standard Specifications (ES. 4756-1 / 2013)
Item | -- | Spec. Limit | Test Result |
---|---|---|---|
SiO2 | % | ---- | 24.29 |
Al2O3 | % | ---- | 5.72 |
Fe2O3 | % | ---- | 6.68 |
CaO | % | ---- | 55.40 |
MgO | % | ---- | 2.37 |
SO3 | % | 3.5 max. | 2.18 |
Na2O | % | ---- | 0.75 |
K2O | % | ---- | 0.29 |
Cl | % | 0.10 max. | 0.07 |
Cr (Hexavalent) | ppm | 2.0 max. | 1.65 |
Fineness, Blaine | Cm2 / gm | ---- | 4030 |
Heat of Hydration (7 d) | KJ/kg | 270 max. | < 220 |
Water of Consistency | % | ---- | 27.75 |
Setting time (Vicat): Initial | minutes | 75.0 min. | 165 |
Final | minutes | ---- | 220 |
Le chatelier expansion | mm | 10.0 max. | 1.0 |
Compressive Strength | Mpa(N/mm2) | ||
2 days | ---- | 19.53 | |
7 days | 16.0 min. | 32.50 | |
28 days | 32.5.0 min., 52.5 max. | 34.45 |
- Bags: 50 Kg/bag.
- Jumbo plastic bags: 500 Kg/bag, 1000 Kg/bag, 1500 Kg/bag.
- It is also available in bulk.
It is recommended to follow the following instructions:
- Storage should be done in a dry place and away from ground moisture.
- It is preferable to store on wooden bases.
- Cement should be covered to avoid the rain.
- It is recommended not to pile up any more than ten bags.
It is recommended to retest the cement after 6 weeks from the production date.
It is recommended to follow the following instructions:
- Avoid contact of cement with eyes and skin since it may cause allergic reactions.
- Use gloves and glasses to protect hands and eyes in case of spray applications, or manual mixings.
- Inhalation: May cause respiratory irritation. Repeated exposure to cement can cause damage to the lungs.
- Skin contact: Causes severe burns and may cause an allergic skin reaction.
- Eye contact: Causes serious eye damage.
- Eye Contact: Flush the eyes with plenty of water and seek medical doctor advice.
- Skin Contact: Wash the skin with natural soap and water, use moisturizing cream, then consult medical doctor.
- Ingestion: Do not vomit or drink large amount of water and seek medical doctor advice.
- Inhalation: Move person to fresh air area, if the person is not breathing, make CPR (artificial respiration), and if there is difficulty in breathing, provide person with oxygen and seek medical doctor.
- Before setting: by using clean water.
- After setting: by using mechanical methods.
It is advised and recommended to follow local environmental instructions.